Get the guides, first
Seasonal UK driving advice and a heads-up when new stock lands. No spam, unsubscribe any time.





Every order ships free with tracking. Dispatch is usually within 1–2 working days and delivery within 3–8 working days.
Email us your order number within 30 days of delivery and we send the return steps the same working day. Refunds within 5 working days of receipt.
Send your registration or make, model and year to britishgarage.co.uk@gmail.com and we check the listing details against it before you order.
The FOXWELL BT705Plus is a handheld automotive tester that quickly assesses 12V batteries and 12V/24V charging and cranking systems to reveal weak batteries, starter issues, and alternator problems.
Compact and engineered for both professionals and DIYers, the BT705Plus blends faster processing and refined algorithms to return more reliable results, even on low-voltage or nearly depleted batteries. Its 2.8" color display, extended test leads, and multi-mode diagnostics let you run battery health checks, cranking assessments, and charging inspections without guesswork. The tool supports flooded, AGM, spiral-wound, and GEL battery chemistries (not compatible with lithium) and works across passenger cars, trucks, RVs, boats, and heavy equipment.
The BT705Plus runs a targeted battery test that calculates state of health (SOH) and state of charge (SOC) using measured voltage and internal resistance under load. It compares results against the battery's rated CCA to classify the battery’s condition and recommend actions.
Yes—the BT705Plus performs cranking tests that record cranking voltage and cranking time to help pinpoint starter or battery-related starting problems. Run the test while cranking the engine to capture real-world starting behavior.
The charging test inspects charging voltage and monitors alternator ripple to surface regulator or diode faults and unstable charging. Results show whether the charging system maintains correct voltage and whether ripple levels are within acceptable limits.
The unit’s faster processor and tuned algorithms produce results up to 30% quicker than its predecessor while the large color screen shows multi-value diagnostics at a glance. Rugged, high-conductivity clamps and long cables let one person safely perform all tests without assistance.
Who is this for? Mechanics, fleet managers, and hands-on vehicle owners who want a professional-grade, portable diagnostics tool that covers battery health, cranking performance, and charging system integrity. It’s particularly useful for workshops, roadside technicians, and anyone who wants to detect battery or alternator problems early—reducing unexpected breakdowns and unnecessary replacements. Note: the BT705Plus diagnoses systems but does not charge batteries and is not an OBD2 code reader; always enter the battery’s rated CCA and follow test setup steps for consistent results.
Q: Does the BT705Plus charge batteries?
A: No. The BT705Plus diagnoses battery, cranking, and charging systems but does not recharge batteries.
Q: Which battery chemistries does it support?
A: It supports flooded, AGM, spiral, and GEL batteries; it is not compatible with lithium batteries.
Delivery: free tracked delivery to every UK postcode on every order. Most orders are dispatched within 1–2 working days and arrive within 3–8 working days; you receive a tracking link by email as soon as it ships.
Returns: 30 days from delivery to return any unused item in its original packaging. Email us with your order number and we send the return instructions the same working day. Refunds go back to your original payment method within 5 working days of the item arriving with us.
Faulty or wrong item? Tell us within 30 days and we replace or refund it, including the return postage.
Seasonal UK driving advice and a heads-up when new stock lands. No spam, unsubscribe any time.
Thanks for subscribing!
This email has been registered!