Get the guides, first
Seasonal UK driving advice and a heads-up when new stock lands. No spam, unsubscribe any time.





Every order ships free with tracking. Dispatch is usually within 1–2 working days and delivery within 3–8 working days.
Email us your order number within 30 days of delivery and we send the return steps the same working day. Refunds within 5 working days of receipt.
Send your registration or make, model and year to britishgarage.co.uk@gmail.com and we check the listing details against it before you order.
JUNRUO's ready-to-use 96" resistor wire pigtail converts a 12V feed into the correct alternator "on" signal for LS series 4-pin alternators.
This harness is a factory-ready replacement pigtail with a built-in resistor that lowers a full 12-volt source to the voltage an LS-series alternator expects for its 'field on' or remote-excitation signal. It is supplied with an extended 96-inch lead to give you routing flexibility in engine bays and is intended for GM LS engines using the 4-terminal flat alternator connector. The assembly removes the need for custom splices or separate resistors when using an engine control module (ECM) is not an option.
The JUNRUO pigtail bundles the connector, resistor and long lead into one plug-and-play unit so you can replace a worn harness or adapt a 12V signal without extra components. Installation is straightforward: plug into the alternator's 4-pin flat connector and route the 96" lead to your switched 12V source or ignition feed.
This pigtail is designed for 1999 and newer GM LS-series engines that have the 4-pin flat alternator plug common to many Gen III alternators. Confirm your alternator uses the same flat 4-terminal connector and that it requires a reduced-voltage 'on' signal rather than a full 12V field feed.
The long lead eliminates the need for extensions and simplifies neat routing around engine components. Because the resistor is inside the pigtail, you avoid fabricating a separate resistor circuit or modifying the alternator; that keeps the installation cleaner and reversible.
Who this is for: mechanics, hot-rodders, engine-swappers and DIY car owners who need a reliable alternator signal pigtail for GM LS Gen III engines. If you are replacing a damaged plug, retrofitting a non-ECM setup, or wiring an alternator that requires a stepped-down "on" signal, this JUNRUO 96" resistor wire pigtail removes guesswork and avoids custom resistor installations. Confirm connector type and alternator control requirements before purchase for best results.
Q: Is this pigtail plug-and-play for GM LS alternators?
A: Yes—it's a factory-terminated 4-pin flat connector designed for 1999+ GM LS-series alternators that use a stepped-down 'on' signal.
Q: Can the 96" lead be shortened if needed?
A: Yes—you can trim and reterminate the lead, but ensure proper insulation and secure connections to maintain reliability.
Delivery: free tracked delivery to every UK postcode on every order. Most orders are dispatched within 1–2 working days and arrive within 3–8 working days; you receive a tracking link by email as soon as it ships.
Returns: 30 days from delivery to return any unused item in its original packaging. Email us with your order number and we send the return instructions the same working day. Refunds go back to your original payment method within 5 working days of the item arriving with us.
Faulty or wrong item? Tell us within 30 days and we replace or refund it, including the return postage.
Seasonal UK driving advice and a heads-up when new stock lands. No spam, unsubscribe any time.
Thanks for subscribing!
This email has been registered!